Skip to content
Investment consultation WhatsApp
📊 Cross-sector investment overview

Top 10 Investment Sectors in Türkiye 2026

Planning scenario, not a return promise · External sources are government/official; JUANA planning assumptions are shown separately

This is a cross-sector study. The reference-sector figures below are one separate example, not estimates for all options. Verify costs, returns and risks for each individual project.

Sourced example for sector: Manufacturing

Data reviewed · 2026-09-11

The figures and sources below concern the example sector alone; they do not represent every sector or project in this study.

A source URL and its record-review date do not verify a figure or its applicability to any project. This is sector context only; reliance requires checking the original document, period and methodology, plus actual project quotations and contracts.

Machinery-sector revenueUSD 57.8B
Period: 2024
Machinery exportsUSD 28.7B
Period: 2025
Machinery-sector employment502,000
Period: 2024

Scope of the comparison

A Manufacturing study starts with the investor objective, horizon and liquidity needs before selecting a specific asset. Factories are assessed through demand, contracts, capacity, equipment efficiency, raw materials, labour, energy, export share, working capital and OSB/free-zone location. The sector index shows a planning entry level of roughly USD 200,000; it is not a fixed market price or a recommendation. The decision must connect capital to location, scale, legal structure, operating model and exit plan, then replace every assumption with evidence from the actual opportunity.

Comparing markets and locations

Market work must prove demand rather than repeat phrases such as ‘strong demand’ or ‘promising sector’. Identify the end customer/user, real substitutes, achieved pricing and reachable demand in the relevant micro-market or value chain. Reference locations include Bursa · Kocaeli · Gaziantep · Izmir · Konya, but a strong city does not make every project within it investable.

Costs

The cost model for this sector does not use a universal CAPEX/OPEX list. The relevant inputs are: industrial premises/lease, machinery and production line, tooling and fit-out, power/gas/water connections, raw materials, labour, quality control, maintenance, scrap and working capital. One-off expenditure, recurring cost, working capital and contingency should be separated, with a source and date for each material figure.

Revenue & feasibility

The sector-specific revenue model is built from: saleable output units × net selling price × capacity utilisation, adjusted for rejects, scrap, returns and discounts; capacity must be tied to equipment specs and operating hours. JUANA uses conservative, base and upside cases, but the base case is accepted only when unit, price and volume can be reviewed. Library ROI ranges are planning variables for comparison, not forecasts for a particular deal.

Risks

The reference risk for this sector is Medium, but it is not inherited automatically by a project. Risk moves with evidence on demand depth, customer/supplier concentration, financing and currency, licences, execution, management, liquidity and data quality. Risk Score therefore remains separate from Investment Score so a theoretical return cannot hide a material documentation or operating weakness.

Potential support

Incentives and exemptions are not included as base-case income and are never treated as an entitlement. Only the official sources linked below are shown for this sector; eligibility remains potential until the activity, location, investment size and current programme rules are verified by the relevant authority and professional advisers.

Due Diligence

Due diligence tests the legal rights on which the project depends, licences that actually apply, tax/finance obligations, material contracts, insurance and the source data behind cost and revenue. For an existing business, claims must reconcile to financial/bank records and contracts; for a new project, assumptions must reconcile to quotations, permits and the implementation schedule without inventing missing documents.

Exit Calculator

Exit analysis identifies the likely buyer, transferability of licences/contracts/rights, realistic time to sell and net proceeds after tax, commissions and debt. If the secondary market is thin or value depends on one operator, liquidity should score lower even when the operating case looks attractive.

Deal Room

This study is a decision framework, not a substitute for deal-specific feasibility. Once an actual opportunity is selected, its assumptions move into JUANA tools and the Deal Room so every conclusion points to a document, source or scenario: compare the sector, enter real project data, stress-test break-even, verify documents and then decide with the appropriate specialist.

Additional analysis

Record-specific analytical enrichment — Sector comparison: Compare property, manufacturing, agriculture, tourism and technology by payback period, liquidity, currency exposure, operating workload and exit options. Do not rank sectors without comparable deal-level evidence. This is a decision checklist, not a guaranteed return or live market quote. Replace assumptions with dated sources, offers and contracts before investing.

Sector studies relevant to this investment overview

The sourced reference-sector snapshot above illustrates only one sector; the comparison text discusses multiple options, and neither replaces due diligence for the specific project. Review the independent sector studies below, then verify capital, liquidity, risks and feasibility for each specific project. This list is not a ranking or a return guarantee.

Türkiye Real Estate Investment Guide 2026

Türkiye investment research: Property due diligence. Model net rent after vacancy, maintenance, fees and tax.

Sector research →

Manufacturing & Factory Investment Study

Türkiye investment research: Manufacturing investment. Match plant capacity to verifiable contracted demand.

Sector research →

Agriculture Investment Study in Türkiye

Türkiye investment research: Agricultural investment. Verify water rights, soil quality, seasonality, cold-chain access and offtake contracts.

Sector research →

Tourism & Hospitality Investment Study

Türkiye investment research: Tourism and hospitality. Build revenue from occupancy, average daily rate, season and channel, then deduct booking fees.

Sector research →

Logistics & Warehousing Study

Türkiye investment research: Logistics and warehousing. Separate contracted storage income from variable handling revenue.

Sector research →

Technology & AI Investment Study

Türkiye investment research: Technology and AI. Validate willingness to pay, compute costs, retention and data rights.

Sector research →

Energy & Efficiency Investment Study

Türkiye investment research: Energy efficiency. Establish a documented consumption baseline, then measure savings after installation, maintenance and degradation.

Sector research →

Land & Property Development Study

Türkiye investment research: Land development. Verify zoning, permitted floor area, road and utility access and permitting costs before calculating residual land.

Sector research →

Healthcare & Medical Tourism Study

Türkiye investment research: Healthcare and medical tourism. Verify licensing, accreditation, professional liability and patient-data protection.

Sector research →

E-commerce & Digital Export Study

E-commerce investment in Türkiye: evidence-led costs, revenue, risk, liquidity and due diligence, with deal-specific assumptions.

Sector research →

Sector-by-sector data and sources in this comparison

Each sector has its own figures, reporting periods, review date and independent sources. Do not transfer a figure between sectors or treat market context as a project return. Open each sector to see all of its evidence.

Real Estate Investment · Sector data reviewed: 2026-09-11
Total home sales4.2M

Period: 2022–2024

Primary source: Investment and Finance Office
Home sales to foreigners126,276

Period: 2022–2024

Primary source: Investment and Finance Office
Istanbul Grade-A office stock6.7M m²

Period: 2024

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Manufacturing · Sector data reviewed: 2026-09-11
Machinery-sector revenueUSD 57.8B

Period: 2024

Primary source: Investment and Finance Office
Machinery exportsUSD 28.7B

Period: 2025

Primary source: Investment and Finance Office
Machinery-sector employment502,000

Period: 2024

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Agriculture · Sector data reviewed: 2026-09-11
Agrofood exportsUSD 36.4B

Period: 2025

Primary source: Investment and Finance Office
Agricultural producer rank in Europe#1 Europe

Period: 2025

Primary source: Investment and Finance Office
Agricultural producer rank globally#7 World

Period: 2025

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Tourism & Hospitality · Sector data reviewed: 2026-09-11
Quarterly tourism incomeUSD 15.87B

Period: 2026 Q2

Primary source: Türkiye İstatistik Kurumu
Average spend per nightUSD 113

Period: 2026 Q2

Primary source: Türkiye İstatistik Kurumu
International tourist arrivals62M

Period: 2024

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Logistics & Warehousing · Sector data reviewed: 2026-09-11
Transport & logistics investmentUSD 280B

Period: 2003–2024

Primary source: Investment and Finance Office
Rail share of logistics investment55%

Period: 2025

Primary source: Investment and Finance Office
Projected freight tonnage1.5B tons

Period: 2035 target

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Technology & AI · Sector data reviewed: 2026-09-11
ICT market sizeUSD 53.8B

Period: 2025

Primary source: Investment and Finance Office
ICT employment289K

Period: 2025

Primary source: Investment and Finance Office
Target private investment in data centers & AIUSD 10B

Period: 2026 program

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Energy & Efficiency · Sector data reviewed: 2026-09-11
Installed electricity capacity122+ GW

Period: 2025

Primary source: Investment and Finance Office
Wind + solar target120 GW

Period: 2035 target

Primary source: Investment and Finance Office
Clean-generation target55%

Period: 2035 target

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Land & Development · Sector data reviewed: 2026-09-11
Organized Industrial Zones392

Period: 2026

Primary source: Investment and Finance Office
Companies producing in OIZs67,000+

Period: 2026

Primary source: Investment and Finance Office
Industrial Zones40

Period: 2026

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Healthcare & Medical Tourism · Sector data reviewed: 2026-09-11
Medical-tourism visitors1.506M

Period: 2024

Primary source: Investment and Finance Office
Medical-tourism contributionUSD 3B

Period: 2024

Primary source: Investment and Finance Office
Medical-device marketUSD 4.5B

Period: 2024

Primary source: Investment and Finance Office

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

E-commerce & Digital Export · Sector data reviewed: 2026-09-12
E-commerce volumeTRY 4.57T

Period: 2025

Primary source: T.C. Ticaret Bakanlığı
E-commerce transactions5.94B

Period: 2025

Primary source: T.C. Ticaret Bakanlığı
Businesses active in e-commerce634,611

Period: 2025

Primary source: T.C. Ticaret Bakanlığı

Source register for this sector

These figures describe only this sector; project economics require separate evidence.

Official Benchmark Dashboard

An official-data snapshot that places the study in macro and sector context. These are context indicators, not return forecasts.

Measurement method
Macro indicators

Exports — August 2026

$23.467B

Period: 2026-08
Record review date: 2026-09-11

Ministry of Trade ↗
These are dated registry snapshots, not live values or return forecasts. A registry review date or authority link does not establish that a figure matches the current primary publication or earn an A evidence grade; verify the figure, period and method at the primary source.

Research playbook for this study

This layer does not repeat the sector description. It identifies what must be measured, evidenced and stress-tested before a general study can become a decision on a real opportunity.

Research methodology
This is a capital-allocation study, not a sector study. It prevents budget size from becoming an automatic purchase recommendation and routes capital through explicit decision gates.

Candidate sectors to research

  • Real Estate Investment
  • Manufacturing
  • Agriculture
  • Tourism & Hospitality
  • Logistics & Warehousing
  • Technology & AI
  • Energy & Efficiency
  • Land & Development
  • Healthcare & Medical Tourism
  • E-commerce & Digital Export

Capital-allocation research framework

Liquidity & due-diligence reserve15–25%
Planning concentration limit≤25%
Review cycleQuarterly

Decision rules

  • Do not deploy 100% of capital into acquisition; retain liquidity for operations, diligence and contingencies.
  • No sector advances to decision before data, risk and exit gates are passed.
  • Compare net cash flow, risk-adjusted return and liquidity—not headline ROI alone.
  • Re-run the case after material changes in FX, financing, regulation or operating assumptions.

JUANA Investment Research Standard

Prepared by: JUANA Investment Research · Last reviewed: Manufacturing · 2026-09-11

Research methodology
Scheduled review every 120 days, or immediately after a material regulatory or market change

22 topic clusters for investing in Türkiye

Each sector has one path connecting learning, definitions, research, feasibility and tools. JUANA does not create near-duplicate pages merely to target query variations.

Sector Index

Frequently asked questions about this study

Does this page recommend investing the entire capital amount?

No. Top 10 Investment Sectors in Türkiye 2026 is a capital-allocation and shortlisting framework, not an instruction to place all liquidity into one asset. Reserve must cover transaction costs, working capital and contingencies.

How should the cash reserve be sized before investing?

Model costs outside the purchase price, the pre-revenue period, working capital and debt service, then stress a delay or revenue shortfall. There is no universal reserve percentage across sectors.

Should capital be split equally across several sectors?

No. Diversification is not equal arithmetic splitting. Allocation depends on risk, liquidity, correlation of income drivers, management capacity and evidence quality for each opportunity.

How are sectors shortlisted for this capital level?

Use realistic entry size, CAPEX, OPEX, working capital, time to cash flow, legal constraints and exit. Only then compare opportunities within sectors that pass those gates.

What is the main error when comparing opportunities at a fixed capital level ?

Comparing headline ROI alone. Compare net cash flow, IRR/NPV where appropriate, liquidity, execution and FX risk, management requirements, evidence quality and net exit proceeds.

When should the portfolio be reallocated or an opportunity stopped?

Define measurable limits before entry: CAPEX overrun, weak demand, licensing failure, deteriorating liquidity or a broken investment thesis. When triggered, re-underwrite or exit rather than defend the old decision.

Editorial review

JUANA Investment Research Desk · Methodology review of sources, model logic, separation of evidence from assumptions, and evidence links.

Feasibility studies across the covered sectors

All published feasibility studies for the sectors in this comparison, labelled by sector and indicative capital. They are not a complete list of live opportunities or an allocation recommendation.

Furnished Apartment Rental Feasibility Study in Turkey

Real Estate Investment

$47,000–$234,000 · 7–12% Planning scenario, not a return promise · Uncalculated planning range

Student Housing Investment Feasibility Study in Turkey

Real Estate Investment

$50,000–$251,000 · 8–13% Planning scenario, not a return promise · Uncalculated planning range

Serviced Apartment Investment Feasibility Study in Turkey

Real Estate Investment

$53,000–$267,000 · 9–14% Planning scenario, not a return promise · Uncalculated planning range

Commercial Shop Rental Income Feasibility Study in Turkey

Real Estate Investment

$57,000–$284,000 · 10–15% Planning scenario, not a return promise · Uncalculated planning range

Small Office Rental Investment Feasibility Study in Turkey

Real Estate Investment

$60,000–$300,000 · 7–16% Planning scenario, not a return promise · Uncalculated planning range

Small Warehouse Rental Income Feasibility Study in Turkey

Real Estate Investment

$63,000–$317,000 · 8–12% Planning scenario, not a return promise · Uncalculated planning range

Boutique Building Renovation Feasibility Study in Turkey

Real Estate Investment

$67,000–$333,000 · 9–13% Planning scenario, not a return promise · Uncalculated planning range

Villa Rental Business Feasibility Study in Turkey

Real Estate Investment

$70,000–$350,000 · 10–14% Planning scenario, not a return promise · Uncalculated planning range

Parking Property Investment Feasibility Study in Turkey

Real Estate Investment

$73,000–$366,000 · 7–15% Planning scenario, not a return promise · Uncalculated planning range

Co-living Property Investment Feasibility Study in Turkey

Real Estate Investment

$76,000–$382,000 · 8–16% Planning scenario, not a return promise · Uncalculated planning range

Bottled Water Factory Feasibility Study in Turkey

Manufacturing

$70,000–$468,000 · 12–25% Planning scenario, not a return promise · Uncalculated planning range

Dairy Processing Factory Feasibility Study in Turkey

Manufacturing

$75,000–$501,000 · 13–26% Planning scenario, not a return promise · Uncalculated planning range

Cheese and Yogurt Production Feasibility Study in Turkey

Manufacturing

$80,000–$534,000 · 14–27% Planning scenario, not a return promise · Uncalculated planning range

Furniture Manufacturing Feasibility Study in Turkey

Manufacturing

$85,000–$567,000 · 15–28% Planning scenario, not a return promise · Uncalculated planning range

Packaging Factory Feasibility Study in Turkey

Manufacturing

$90,000–$600,000 · 12–29% Planning scenario, not a return promise · Uncalculated planning range

Plastic Products Manufacturing Feasibility Study in Turkey

Manufacturing

$95,000–$633,000 · 13–25% Planning scenario, not a return promise · Uncalculated planning range

Detergent Manufacturing Feasibility Study in Turkey

Manufacturing

$100,000–$666,000 · 14–26% Planning scenario, not a return promise · Uncalculated planning range

Cosmetics Manufacturing Feasibility Study in Turkey

Manufacturing

$105,000–$699,000 · 15–27% Planning scenario, not a return promise · Uncalculated planning range

Aluminium Profile Production Feasibility Study in Turkey

Manufacturing

$110,000–$732,000 · 12–28% Planning scenario, not a return promise · Uncalculated planning range

Automotive Spare Parts Production Feasibility Study in Turkey

Manufacturing

$115,000–$765,000 · 13–29% Planning scenario, not a return promise · Uncalculated planning range

Fruit & food freeze-drying line

Manufacturing

$350,000–$1,500,000 · 12–24% Planning scenario, not a return promise · Uncalculated planning range

Sunflower oil crushing, refining & bottling plant

Manufacturing

$1,200,000–$7,000,000 · 8–17% Planning scenario, not a return promise · Uncalculated planning range

Olive oil mill, bottling & export brand

Manufacturing

$450,000–$3,000,000 · 9–20% Planning scenario, not a return promise · Uncalculated planning range

Corn germ oil extraction, refining & bottling plant

Manufacturing

$1,400,000–$8,000,000 · 8–17% Planning scenario, not a return promise · Uncalculated planning range

Mersin juice and energy drinks: $500k contract brand or $4.5m factory

Manufacturing

$500,000–$4,500,000 · Not yet calculated

Olive Grove Investment Feasibility Study in Turkey

Agriculture

$31,000–$195,000 · 10–22% Planning scenario, not a return promise · Uncalculated planning range

Pistachio Orchard Investment Feasibility Study in Turkey

Agriculture

$33,000–$209,000 · 11–23% Planning scenario, not a return promise · Uncalculated planning range

Walnut Orchard Investment Feasibility Study in Turkey

Agriculture

$36,000–$222,000 · 12–24% Planning scenario, not a return promise · Uncalculated planning range

Hazelnut Orchard Investment Feasibility Study in Turkey

Agriculture

$38,000–$236,000 · 13–25% Planning scenario, not a return promise · Uncalculated planning range

Medicinal Herb Farming Feasibility Study in Turkey

Agriculture

$40,000–$250,000 · 10–26% Planning scenario, not a return promise · Uncalculated planning range

Strawberry Greenhouse Feasibility Study in Turkey

Agriculture

$42,000–$264,000 · 11–22% Planning scenario, not a return promise · Uncalculated planning range

Tomato Greenhouse Feasibility Study in Turkey

Agriculture

$44,000–$278,000 · 12–23% Planning scenario, not a return promise · Uncalculated planning range

Mushroom Production Feasibility Study in Turkey

Agriculture

$47,000–$291,000 · 13–24% Planning scenario, not a return promise · Uncalculated planning range

Seedling Nursery Feasibility Study in Turkey

Agriculture

$49,000–$305,000 · 10–25% Planning scenario, not a return promise · Uncalculated planning range

Hydroponic Leafy Greens Feasibility Study in Turkey

Agriculture

$51,000–$319,000 · 11–26% Planning scenario, not a return promise · Uncalculated planning range

Boutique Hotel Feasibility Study in Turkey

Tourism & Hospitality

$62,000–$390,000 · 12–28% Planning scenario, not a return promise · Uncalculated planning range

Serviced Apartments Feasibility Study in Turkey

Tourism & Hospitality

$67,000–$418,000 · 13–29% Planning scenario, not a return promise · Uncalculated planning range

Bungalow Resort Feasibility Study in Turkey

Tourism & Hospitality

$71,000–$445,000 · 14–30% Planning scenario, not a return promise · Uncalculated planning range

Rural Tourism and Farm Stay Feasibility Study in Turkey

Tourism & Hospitality

$76,000–$473,000 · 15–31% Planning scenario, not a return promise · Uncalculated planning range

Inbound Tour Agency Feasibility Study in Turkey

Tourism & Hospitality

$80,000–$500,000 · 12–32% Planning scenario, not a return promise · Uncalculated planning range

Yacht Services Business Feasibility Study in Turkey

Tourism & Hospitality

$84,000–$528,000 · 13–28% Planning scenario, not a return promise · Uncalculated planning range

City Hostel Feasibility Study in Turkey

Tourism & Hospitality

$89,000–$555,000 · 14–29% Planning scenario, not a return promise · Uncalculated planning range

Glamping Project Feasibility Study in Turkey

Tourism & Hospitality

$93,000–$582,000 · 15–30% Planning scenario, not a return promise · Uncalculated planning range

Tourist Restaurant Feasibility Study in Turkey

Tourism & Hospitality

$98,000–$610,000 · 12–31% Planning scenario, not a return promise · Uncalculated planning range

Short-Stay Accommodation Management Feasibility Study in Turkey

Tourism & Hospitality

$102,000–$638,000 · 13–32% Planning scenario, not a return promise · Uncalculated planning range

General warehouse

Logistics & Warehousing

$78,000–$546,000 · 10–22% Planning scenario, not a return promise · Uncalculated planning range

Cold storage

Logistics & Warehousing

$84,000–$584,000 · 11–23% Planning scenario, not a return promise · Uncalculated planning range

E-commerce fulfillment

Logistics & Warehousing

$89,000–$623,000 · 12–24% Planning scenario, not a return promise · Uncalculated planning range

Last-mile delivery

Logistics & Warehousing

$94,000–$662,000 · 13–25% Planning scenario, not a return promise · Uncalculated planning range

Small trucking fleet

Logistics & Warehousing

$100,000–$700,000 · 10–26% Planning scenario, not a return promise · Uncalculated planning range

Bonded warehouse

Logistics & Warehousing

$106,000–$739,000 · 11–22% Planning scenario, not a return promise · Uncalculated planning range

Export distribution hub

Logistics & Warehousing

$111,000–$777,000 · 12–23% Planning scenario, not a return promise · Uncalculated planning range

Food cold logistics

Logistics & Warehousing

$116,000–$816,000 · 13–24% Planning scenario, not a return promise · Uncalculated planning range

Pharma cold chain

Logistics & Warehousing

$122,000–$854,000 · 10–25% Planning scenario, not a return promise · Uncalculated planning range

Packaging logistics hub

Logistics & Warehousing

$127,000–$892,000 · 11–26% Planning scenario, not a return promise · Uncalculated planning range

Solar-assisted cold-chain packhouse

Logistics & Warehousing

$300,000–$1,200,000 · 10–20% Planning scenario, not a return promise · Uncalculated planning range

AI automation agency

Technology & AI

$16,000–$140,000 · 15–35% Planning scenario, not a return promise · Uncalculated planning range

Vertical SaaS

Technology & AI

$17,000–$150,000 · 16–36% Planning scenario, not a return promise · Uncalculated planning range

Export e-commerce brand

Technology & AI

$18,000–$160,000 · 17–37% Planning scenario, not a return promise · Uncalculated planning range

Mobile app studio

Technology & AI

$19,000–$170,000 · 18–38% Planning scenario, not a return promise · Uncalculated planning range

Mobile game studio

Technology & AI

$20,000–$180,000 · 15–39% Planning scenario, not a return promise · Uncalculated planning range

Cybersecurity service

Technology & AI

$21,000–$190,000 · 16–35% Planning scenario, not a return promise · Uncalculated planning range

ERP integration

Technology & AI

$22,000–$200,000 · 17–36% Planning scenario, not a return promise · Uncalculated planning range

EdTech platform

Technology & AI

$23,000–$210,000 · 18–37% Planning scenario, not a return promise · Uncalculated planning range

B2B digital marketing

Technology & AI

$24,000–$220,000 · 15–38% Planning scenario, not a return promise · Uncalculated planning range

B2B export marketplace

Technology & AI

$26,000–$229,000 · 16–39% Planning scenario, not a return promise · Uncalculated planning range

Industrial rooftop solar

Energy & Efficiency

$47,000–$390,000 · 10–24% Planning scenario, not a return promise · Uncalculated planning range

Farm solar system

Energy & Efficiency

$50,000–$418,000 · 11–25% Planning scenario, not a return promise · Uncalculated planning range

EV charging station

Energy & Efficiency

$53,000–$445,000 · 12–26% Planning scenario, not a return promise · Uncalculated planning range

Energy audit service

Energy & Efficiency

$57,000–$473,000 · 13–27% Planning scenario, not a return promise · Uncalculated planning range

Commercial battery storage

Energy & Efficiency

$60,000–$500,000 · 10–28% Planning scenario, not a return promise · Uncalculated planning range

Heat pump installation

Energy & Efficiency

$63,000–$528,000 · 11–24% Planning scenario, not a return promise · Uncalculated planning range

Solar irrigation

Energy & Efficiency

$67,000–$555,000 · 12–25% Planning scenario, not a return promise · Uncalculated planning range

Industrial efficiency retrofit

Energy & Efficiency

$70,000–$582,000 · 13–26% Planning scenario, not a return promise · Uncalculated planning range

LED efficiency business

Energy & Efficiency

$73,000–$610,000 · 10–27% Planning scenario, not a return promise · Uncalculated planning range

Solar O&M service

Energy & Efficiency

$76,000–$638,000 · 11–28% Planning scenario, not a return promise · Uncalculated planning range

Industrial energy-efficiency retrofit company

Energy & Efficiency

$250,000–$1,000,000 · 9–19% Planning scenario, not a return promise · Uncalculated planning range

Residential Development Land Feasibility Study in Turkey

Land & Development

$39,000–$273,000 · 8–20% Planning scenario, not a return promise · Uncalculated planning range

Industrial Land Investment Feasibility Study in Turkey

Land & Development

$42,000–$292,000 · 9–21% Planning scenario, not a return promise · Uncalculated planning range

Agricultural Land Investment Feasibility Study in Turkey

Land & Development

$44,000–$312,000 · 10–22% Planning scenario, not a return promise · Uncalculated planning range

Tourism-Zoned Land Investment Feasibility Study in Turkey

Land & Development

$47,000–$331,000 · 11–23% Planning scenario, not a return promise · Uncalculated planning range

Villa Development Land Feasibility Study in Turkey

Land & Development

$50,000–$350,000 · 8–24% Planning scenario, not a return promise · Uncalculated planning range

Warehouse and Logistics Land Feasibility Study in Turkey

Land & Development

$53,000–$369,000 · 9–20% Planning scenario, not a return promise · Uncalculated planning range

Commercial Development Plot Feasibility Study in Turkey

Land & Development

$56,000–$389,000 · 10–21% Planning scenario, not a return promise · Uncalculated planning range

Urban Expansion Land Investment Feasibility Study in Turkey

Land & Development

$58,000–$408,000 · 11–22% Planning scenario, not a return promise · Uncalculated planning range

Permitted Land Development Feasibility Study in Turkey

Land & Development

$61,000–$427,000 · 8–23% Planning scenario, not a return promise · Uncalculated planning range

Small Build-to-Sell Development Feasibility Study in Turkey

Land & Development

$64,000–$446,000 · 9–24% Planning scenario, not a return promise · Uncalculated planning range

Dental clinic

Healthcare & Medical Tourism

$55,000–$390,000 · 14–30% Planning scenario, not a return promise · Uncalculated planning range

Hair transplant clinic

Healthcare & Medical Tourism

$58,000–$418,000 · 15–31% Planning scenario, not a return promise · Uncalculated planning range

Aesthetic clinic

Healthcare & Medical Tourism

$62,000–$445,000 · 16–32% Planning scenario, not a return promise · Uncalculated planning range

Physiotherapy centre

Healthcare & Medical Tourism

$66,000–$473,000 · 17–33% Planning scenario, not a return promise · Uncalculated planning range

Medical tourism agency

Healthcare & Medical Tourism

$70,000–$500,000 · 14–34% Planning scenario, not a return promise · Uncalculated planning range

Diagnostic centre

Healthcare & Medical Tourism

$74,000–$528,000 · 15–30% Planning scenario, not a return promise · Uncalculated planning range

Home care service

Healthcare & Medical Tourism

$78,000–$555,000 · 16–31% Planning scenario, not a return promise · Uncalculated planning range

Wellness clinic

Healthcare & Medical Tourism

$82,000–$582,000 · 17–32% Planning scenario, not a return promise · Uncalculated planning range

Eye clinic

Healthcare & Medical Tourism

$85,000–$610,000 · 14–33% Planning scenario, not a return promise · Uncalculated planning range

Dental laboratory

Healthcare & Medical Tourism

$89,000–$638,000 · 15–34% Planning scenario, not a return promise · Uncalculated planning range

Digital export brand

E-commerce & Digital Export

$50,000–$150,000 · 14–35% Planning scenario, not a return promise · Uncalculated planning range

Multi-marketplace operator

E-commerce & Digital Export

$70,000–$220,000 · 12–30% Planning scenario, not a return promise · Uncalculated planning range

E-commerce fulfilment centre

E-commerce & Digital Export

$120,000–$350,000 · 10–25% Planning scenario, not a return promise · Uncalculated planning range

The figures and sources below concern the example sector alone; they do not represent every sector or project in this study. Manufacturing

Study data passport

Current study confidence: C — JUANA planning benchmark · Last reviewed: 2026-09-11 · Current

Upgrade confidence to A in Deal Room
This is a library/planning page. It becomes A only after assumptions are replaced by deal documents and reviewed in the Deal Room. JUANA does not use hidden estimates to replace a missing material document.
Methodology & number provenanceSource classificationData confidenceLast reviewedWhat must replace it before investment?
Capital rangeJUANA planning assumption — not a government figureC — JUANA planning benchmark2026-09-11Replace with actual quotations, asset/land/equipment price, setup cost and working capital.
Risk levelJUANA planning assumption — not a government figureC — JUANA planning benchmark2026-09-11Update after contracts, licences, financing, management, customer/supplier concentration and liquidity are reviewed.
Suggested regionsJUANA planning assumption — not a government figureC — JUANA planning benchmark2026-09-11Verify the actual micro-market, site, pricing, demand, permits and infrastructure.
Project method & KPIsJUANA methodology for this project typeB — Source-backed context & fit-for-purpose method2026-09-11Tie every KPI to an operating record, quotation, contract or reviewable document.
External official contextPrimary government/official sourcesD — Unverified; do not use for decisionRecheck the current official version on the transaction date.
JUANA Intelligent Site AgentKnows JUANA public sections, pages and content
Would you like an advisor to contact you?
The agent searches public site content only. Chat and browsing data may be stored to improve service and connect your request with the sales team. Private admin/client data is never exposed.