Pre-Commitment Freeze — Independent unit number
Core question
Make the conclusion reproducible by another reviewer. For “Pre-Commitment Freeze — Independent unit number”, begin with independent and unit and make sure both relate to the same asset, party and review date.
Independent check
Check number independently from the person or document that supplied independent. If it conflicts with commitment, identify the authoritative owner of the fact and obtain a fresh record.
Failure scenario
Failure example: independent looks correct, but freeze belongs to a different date, unit or transaction. Keep the issue open and record whether it affects price, payment, use, finance, possession or registration.
- source
- freeze
- commitment
- number
- official
- independent
Practical cure
Required evidence
Build the evidence set around independent, unit, number, commitment, freeze and official. Mark each as verified, conflicting, stale or unavailable.
- source
- unit
- independent
- commitment
- official
- freeze
Decision rule
Audit trail
Record-specific evidence matrix
| Item | Cross-check | Status |
|---|---|---|
| source | commitment | Open / Verified |
| official | date | Open / Verified |
| number | unit | Open / Verified |
Official sources
Practical FAQ built from the record’s verified facts
What official fact about independent-unit number should a buyer verify before a non-refundable commitment?
The independent-unit number is a legal identifier within the condominium system and may differ from the door or marketing number. Reconcile it with floor, use, approved project and title record. Before a non-refundable deposit or binding signature, freeze a dated reference copy of the data supporting the decision. If closing is delayed or the project/registry changes, use that frozen set as a comparison baseline and recheck.
Which document fields or legal details on independent-unit number matter most before a non-refundable commitment?
What can go wrong with independent-unit number before a non-refundable commitment, and what evidence resolves it?
TKGM condominium/construction-servitude materials show independent units being created and linked to the project and land shares, so the unit must be checked within that structure rather than as an isolated number. Before a non-refundable deposit or binding signature, freeze a dated reference copy of the data supporting the decision. If closing is delayed or the project/registry changes, use that frozen set as a comparison baseline and recheck.
Sources for this section were reviewed on 16 August 2026.
- TKGM — Kat İrtifakı ve Kat Mülkiyeti Genelge 2021/4
- TKGM — Kat İrtifakı Tesisi
- TKGM — Kat Mülkiyeti Tesisi
Pre-commitment freeze
Evidence and decision plan for Pre-Commitment Freeze — Independent unit number
The due-diligence purpose of “Pre-Commitment Freeze — Independent unit number” is to freeze the material transaction facts and document versions before a deposit, reservation, signature or other commitment becomes difficult to reverse. A reviewer should be able to trace every material conclusion to a current source and identify any assumption that has not yet become evidence.
Evidence to assemble
- For “Pre-Commitment Freeze — Independent unit number”, match the property and party identifiers in the evidence to the asset and people actually involved; a correct document for the wrong unit or person does not close the check.
- For “Pre-Commitment Freeze — Independent unit number”, record issuer, source, issue or retrieval date and version where available, then distinguish an original/current record from a scan, translation, draft, expired copy or superseded version.
- For “Pre-Commitment Freeze — Independent unit number”, compare documentary status with the physical, payment or operational reality relevant to the topic and write down every unexplained difference before commitment.
- For “Pre-Commitment Freeze — Independent unit number”, convert each unresolved difference into a named condition: evidence required, person responsible, deadline and the consequence if the condition is not satisfied.
Official reference to recheck
The source register for “Pre-Commitment Freeze — Independent unit number” includes TKGM — Tapu ve Kadastro Genel Müdürlüğü (https://www.tkgm.gov.tr/anasayfa). Use that source for the matters within its authority and recheck it when timing or rules are material; it does not replace a registry, engineering, tax, banking or contractual record that the specific decision separately requires.
Decision boundary
For “Pre-Commitment Freeze — Independent unit number”, a residual issue should remain open whenever its legal, technical, tax, payment or cost consequence cannot yet be measured. The file is ready only when that issue is closed or consciously accepted by the appropriate decision-maker.
Freezing the independent-unit number before commitment
Before a deposit or other non-refundable commitment, the independent-unit identity should be frozen across the evidence set: title record, plan or project schedule, contract, and valuation where one is being used. A marketing label such as “A‑1203” is not enough if the official record uses another number; the relationship between commercial and legal identifiers must be documented.
After the freeze, any unit-number change reopens the check before further money moves. The discrepancy can point to a different floor, appurtenance, ownership share or even a different asset. Preserve the evidence set that was current when the commitment was made so later changes cannot silently rewrite what the buyer agreed to acquire.
