Change Control — Construction servitude status
A practical Change Control workflow for Construction servitude status, focused on evidence, timing, record reconciliation, exception closure and an auditable decision.
Verified facts relevant to this topic
Purpose of this guide
Change Control — Construction servitude status applies an operational verification workflow to Construction servitude status. The specific objective is to record every change in document, price, party or date and compare it with the version on which the earlier decision was based. A fact should not be treated as operationally reliable merely because it exists; it must be tied to the correct property, party and date and supported by evidence that another reviewer can audit later.
When to use this review
- Before signing a contract or amendment that changes rights or obligations.
- Before sending money or changing a beneficiary or account.
- When a new version of a previously relied-on document arrives.
- When there is a new version or a change in amount, party or date.
- When the database and a primary document or official source disagree.
- Before final closing when the information can change over time.
Change Control — Construction servitude status
A practical Change Control workflow for Construction servitude status, focused on evidence, timing, record reconciliation, exception closure and an auditable decision.
Financial and operational impact
Verified facts from official sources
Change control
Practical FAQ built from the record’s verified facts
What official fact about construction servitude (Kat İrtifakı) should a buyer verify after the underlying record changes?
Kat İrtifakı is a construction-servitude regime linked to a project and future/under-construction independent units; it is not automatically equivalent to Kat Mülkiyeti. If registry, project, numbering or share data changes after verification begins, preserve the old and new versions with date and reason. A valid change may be legitimate; relying on a superseded version is the real risk.
Which document fields or legal details on construction servitude (Kat İrtifakı) matter most after the underlying record changes?
If registry, project, numbering or share data changes after verification begins, preserve the old and new versions with date and reason. A valid change may be legitimate; relying on a superseded version is the real risk. Kat İrtifakı is a construction-servitude regime linked to a project and future/under-construction independent units; it is not automatically equivalent to Kat Mülkiyeti. TKGM guidance links this status to architectural projects, units and land shares; since the nationwide 3D-building-model rollout in 2025, digital model consistency has become increasingly important.
What can go wrong with construction servitude (Kat İrtifakı) after the underlying record changes, and what evidence resolves it?
TKGM guidance links this status to architectural projects, units and land shares; since the nationwide 3D-building-model rollout in 2025, digital model consistency has become increasingly important. If registry, project, numbering or share data changes after verification begins, preserve the old and new versions with date and reason. A valid change may be legitimate; relying on a superseded version is the real risk.
Sources for this section were reviewed on 16 August 2026.
- TKGM — Kat İrtifakı ve Kat Mülkiyeti Genelgesi
- TKGM — 3D Building Model Project
- TKGM — Hatay 3B Kadastro Bilgilendirme
Change control for construction servitude
When the project, land share, unit number or conversion toward Kat Mülkiyeti changes, open a new review version. Compare every new document with the prior baseline and record effects on price, payment and handover rather than treating the change as administrative only.